Detached ADUs & Casitas in Austin, TX
We design and build detached ADUs and casitas across Austin, from backyard cottages and guest houses to full standalone homes with their own kitchen and entrance. Every project starts with a free, no-obligation design consultation, on site or virtual, covering scope, budget and timeline, with a preliminary estimate.
A detached ADU gives you a separate structure in the backyard for family, guests, a rental, or a home office, without changing the main house. Homeowners choose a standalone build when they want privacy between the two homes and a layout designed around how the new unit will actually be used.
Planning a bigger project? See our ADUs and casitas or home additions.
- Expert consultation, design, and installation.
- Dedicated project manager.
- We help you design your space!
- Help with the permitting process.
- 3-D rendering of your project.
- Licensed, Insured and Bonded!



Options
Detached ADUs we build
We build standalone ADUs in a range of sizes and layouts to fit your lot and your goals.
Backyard Cottage
A standalone cottage set apart from the main house, built as its own small home.
Guest House ADU
A detached unit designed for visiting family or guests, with its own living space.
Studio or One-Bedroom Detached ADU
A compact standalone layout suited to a single resident or a rental unit.
Two-Bedroom Detached ADU
A larger standalone home with room for a family, roommates, or long-term guests.
Modern or Traditional Detached ADU
A standalone build designed in a modern or traditional style to match your preference.
Small Backyard ADU
A smaller footprint detached unit sized to fit a tighter backyard or lot.
Before you start
Is a detached ADU right for your lot?
A few things about your property shape what kind of standalone unit will work.
- Lot size and zoning. The City says an ADU may be built when the property is zoned SF-1, SF-2 or SF-3 and the lot is at least 5,750 square feet.
- Space between structures. Austin zoning no longer sets a minimum distance between units on a lot, but the spacing required by the International Residential Code still applies.
- Setback from the rear property line. In the SF-3 district, the rear yard setback is five feet for an accessory building that is no more than one story or 15 feet tall.
- Utility connections. Each new dwelling unit needs its own unique address, and a structure counted as a dwelling unit must meet utility meter requirements.
- Deed restrictions. The City says the applicant is responsible for checking deed restrictions and restrictive covenants on the property.
What you gain
- A fully separate home on your property for family, guests, or a tenant
- A dedicated project manager coordinating the build from consultation to walkthrough
- A layout and finishes planned around how you will use the standalone unit
What to plan for
- Permit review and utility connection timing before construction starts
- Budget shaped by foundation, utility hookups and finish choices
- Checking your lot's zoning and any deed restrictions early
Permits
Detached ADU permits in Austin
The City says an ADU may be built when the property is zoned SF-1, SF-2 or SF-3 and the lot is at least 5,750 square feet, and the allowed size of the unit depends on the zoning district and where the property sits in the city. Austin zoning no longer sets a minimum distance between units on a lot, though the spacing required by the International Residential Code still applies. In the SF-3 district, the rear yard setback for an accessory building no more than one story or 15 feet tall is five feet, and you can review the SF-3 accessory setback rules directly.
Each new dwelling unit needs its own unique address, and a structure that counts as a dwelling unit must follow dwelling unit rules including utility meter requirements. Austin Energy requires a new address request for each new unit with metered electric service, and the electric permit is applied for through the City's Development Services Department, details are on the Austin Energy construction and renovation page. Water and wastewater permitting, meter installation and tap connections for the new unit go through the Utility Permitting Office.
Good to know
Construction cannot start until permits have been paid for and activated, and the Certificate of Occupancy is issued at the end of the process once the unit passes all final inspections. You can review your property's own additional dwelling unit requirements before planning the build.
An ADU built after October 1, 2015 may not be used as a short-term rental for more than 30 days in a calendar year, so factor that into how you plan to use the finished unit.
Scope
What a detached ADU includes
A detached ADU project can include any of the following depending on your layout and goals.
- Full kitchen for independent living
- Private entrance separate from the main house
- Covered porch or patio space
- Home office area within the unit
- Accessible design features
- One-bedroom or two-bedroom layouts
- Studio layout for a compact footprint
- Modern or traditional exterior styling
SEAMLESS AND STRESS-FREE EXPERIENCE
From the initial consultation to selecting design and materials, right through to the final walkthrough, we ensure a seamless and stress-free experience.
Initial Consultation & Quoting
We begin with an on-site or virtual meeting to discuss your project scope, budget, and timeline. We assess your space, understand your vision, and provide a preliminary estimate to align expectations.
Detailed Design and Planning
Our team collaborates with you to finalize design concepts, material selections, and project specifications. We refine layouts, create 3D renderings if necessary, and ensure all selections align with your style and budget.
Permits & Pre-Construction Preparation
We handle all necessary permits and approvals, ensuring compliance with local building codes. Our team finalizes timelines, orders materials, and prepares the job site for a smooth construction process.
Construction and Installation
Our skilled craftsmen bring the vision to life, handling demolition, framing, electrical, plumbing, and all necessary construction work. We maintain open communication, provide progress updates, and ensure precision in every step.
Quality Check & Finishing Touches
We conduct thorough inspections, ensuring every detail meets our high standards. Our team completes finishing work, including painting, cabinetry, flooring, and fixture installations, guaranteeing a polished and flawless final result.
Final Walkthrough & Job Delivery
We walk through the completed project with you, reviewing all work and addressing any final adjustments. Your satisfaction is our priority, and we ensure every aspect of the job meets your expectations before closing out the project.
Schedule Your free consultation
Don’t wait to create the home of your dreams with us. Schedule your FREE design consultation with Austin Home Additions & ADUs today and let us bring your vision to life!
Licensed-Insured-Bonded
Austin Home Additions & ADUs is fully licensed, insured, and bonded, offering you complete confidence in our expertise and professionalism. This dedication guarantees your project is safeguarded from start to finish, giving you peace of mind every step of the way.
Austin Five-Star Rated Home Additions & ADUs
We manage the detached ADU process from first idea to final walkthrough.
Dedicated project manager: Each project has a dedicated project manager who coordinates the work and keeps you updated from the first consultation to the final walkthrough.
Permits handled for you: We handle the permits and approvals for your detached ADU and design to local building codes.
Design before construction: During design we finalize layouts, materials and specifications with you and create 3-D renderings where needed, before any work begins.
Reach out to start planning your detached ADU with a free design consultation.
Five-Star Reputation!
Trusted by countless homeowners, our five-star reputation speaks to the quality and care in every project we undertake. At Austin Home Additions & ADUs, your satisfaction is the foundation of our success.
FAQ
Detached ADU questions
How much does a detached ADU cost in Austin?
Cost depends on the size of the space, the foundation and structural work, utility connections and finishes. We discuss your budget at the free consultation and give a preliminary estimate before design starts, then refine it during design.
How long does it take to build a detached ADU?
Timelines depend on the scope of the project and on permit review. We discuss the timeline at the first meeting and confirm the schedule once permits and materials are in place.
Can I build a detached ADU on any lot in Austin?
The City says an ADU may be built when the property is zoned SF-1, SF-2 or SF-3 and the lot is at least 5,750 square feet. The allowed size of the unit depends on the zoning district and where the property is located in the city.
How far does a detached ADU need to be from my house?
Austin zoning no longer sets a minimum distance between units on a lot, but the spacing required by the International Residential Code still applies. In the SF-3 district, the rear yard setback for an accessory building that is no more than one story or 15 feet tall is five feet.
Can I rent out my detached ADU short-term?
An Austin ADU built after October 1, 2015 may not be used as a short-term rental for more than 30 days in a calendar year. Plan your intended use of the unit around this rule before finalizing your layout.
Does my detached ADU need its own address and utility meter?
Each new dwelling unit in Austin needs its own unique address or building number, and a structure that counts as a dwelling unit must follow all dwelling unit rules including utility meter requirements. Austin Energy requires a new address request for each new unit that will have metered electric service, and water and wastewater connections go through the Utility Permitting Office.
Where we build
We build detached ADUs and casitas in Austin and nearby communities including Round Rock, Georgetown, Cedar Park, Leander, Pflugerville, Lakeway, Bee Cave, West Lake Hills, Buda, Kyle and Dripping Springs.